Plan your transport
If a lighting desk is shared between several events, get confirmation that it really travels on this date. A system plan is a useful guide but does not replace a container list: it may show components that are never handed over at collection. The clearer the assignment, the faster the lighting is set up at the stand.
What matters
- Fixtures, control and accessories are recorded as one system with a shared ID.
- The number of transport containers per system is given, not just the number of fixtures.
- Rigging materials such as clamps and safety cables are listed in full.
